What You Need To Know About Platinum Paving – Kansas City Asphalt Paving

Asphalt paving construction can be a time-consuming job. It can also be difficult if particular steps are not taken and the planning process is not done properly. If you try to spread asphalt before the area is fully ready, it will not be durable or smooth. The majority of homeowners will employ a specialist asphalt paving company with several years of experience and references to back up their claims. Check Platinum Paving – Kansas City Asphalt Paving – Kansas City asphalt companies.

If you’re getting a driveway poured, the best place to start is next to the garage or at the end of the driveway. Label your starting point with a wooden stake in the ground once you’ve settled on it. Continue to mark the area with a tape measure all the way around the perimeter. Place a wooden stake in each corner. You may use a laser level to measure from one corner to the other, mark the numbers down, and repeat for all four corners to ensure that the region is symmetrical. If your numbers match, it’s square, and you’re ready to move on to the next level.

Prepare the field for the gravel and asphalt by digging it out. Take a string and stretch it from one wooden post to the next, digging out at least twenty inches within the string. You want to get it as close to the twenty-inch mark as possible. By compacting the entire area with a gas-powered compactor, you will ensure that the area you dug does not settle and ruin the asphalt layer. If the underside isn’t level and solid, the next layer will be as well.

You’ll need some inexpensive lumber to build a fence around the perimeter that is flush with the land. If necessary, protect the frame with small stakes around the outer edges. After you’ve compacted the soil, you can move on to the next stage. If the homeowner has engaged a professional asphalt paving company, they will hand over control of the project at this stage. A sheet of landscaping mesh will be spread across the field, followed by layers of pea gravel. A total of five layers will be present. Before the next layer is laid down, each layer will be levelled out with a shovel or rake and compacted. When the asphalt is poured, the company will spread it out to ensure that it is correctly sloped for water run-off. Before it dries, they’ll compact it as well.